Applies to: All-In Commercial Max models.
Technician Note: Use accompanying step-by-step photos and video clips for visual reference.
Tools Required
- 7mm socket / hex nut driver
- Towel
Job Checklists
- Arrival Checklist
- 1.43 UI Replacement Checklist
- End of Job Checklist
1.43 UI Replacement Prep
Power Down Plunge
🚨 Important: Do not power down the Plunge before pausing the chiller. Powering down the Plunge while it is in a cooling cycle can damage the chiller. |
1.43 UI Replacement Work Instructions
Remove Chiller Vents and Thumb Nuts
|
|
Remove Rear Cover
|
|
Disconnect Ribbon Cable From UI
|
|
Remove UI
|
|
Install UI
|
|
Connect Ribbon Cable To UI
|
|
Test UI for Functionality
|
|
Power Down Plunge
🚨 Important: Do not power down the Plunge before pausing the chiller. Powering down the Plunge while it is in a cooling cycle can damage the chiller. |
|
Install Rear Cover
|
|
Finalize Job
|
Comments
0 comments
Please sign in to leave a comment.