Remove Chiller Vents and Thumb Nuts
Remove both chiller vent panels.
-
Unscrew all 5 thumb nuts:
Note: Bottom-right nut may be an 8mm hex nut—use socket if necessary.
|
|
Remove Rear Cover
|
|
Remove Chiller Mounting Nuts
|
|
Remove E-Box Cover
|
|
Disconnect Electrical Components
-
Disconnect Hanna Auto-Doser and LED connectors (press tab and pull from plastic base).
Hanna wires: blue, brown, green/yellow.
Some setups may use a Y-splitter. Remove Y-splitter and set aside to install onto new chiller.
Disconnect UI ribbon cable from back of UI (spread wing tabs to release).
-
Thread the LED wire out through its passthrough hole.
Warning: Never pull wires directly. Use only connectors to disconnect.
|
|
Cut Electrical Zip Ties
|
|
Disconnect Plumbing Manifolds
|
|
Remove Chiller
Warning: Move slowly. Use 2 people if needed.
Grab handles on both sides of the chiller base.
Carefully lift and walk the unit forward.
Angle the top of the chiller back to clear the e-box from the tub wall.
|
|
Install Plumbing Manifolds on New Chiller
|
|
Install New UI Ribbon Cable to
Always replace with new cable.
Connect new ribbon cable—red stripe faces down.
Pinch wing tabs closed to lock.
|
|
|
Install New Chiller
Tilt the top of the chiller so the e-box can clear the top of the tub.
- Walk the base of the chiller to the base of the frame.
Lift and place the chiller onto the frame of the chiller cabinet.
Line up and slide the bolts to the holes in the chiller base.
|
|
Connect Plumbing to Tub
|
|
Connect Ribbon Cable To UI
Locate the UI ribbon cable coming from the back of the electrical box.
-
Ensure the red stripe on the ribbon cable is facing down
Open the wing tabs on the UI connector to allow for cable insertion.
Insert the ribbon cable into the UI connector until it clicks into place.
Close the wing tabs around the ribbon cable to secure the connection.
|
|
Connect Electrical Components
Refer to PCB board diagram to ensure all electronics are plugged into the proper ports.
Reconnect all components to their correct ports.
- Install the Hanna auto-doser splitter from the previous chiller (if applicable)
- The splitter plugs into the AC In port of the PCB board.
Double check all plugs before continuing.
Note: Do not install e-box or rear cover yet—testing comes next.
|
|
Test New Chiller
Follow standard testing protocol:
- Fill the tub until the water level is 1/2 inches above "min" line on skimmer.
⚠️ Running the system with low water may damage the pump.
-
🚨 Open the auto-doser ball valves.🚨
- ⚠️ Running the system with the ball valves closed will damage the chiller.
- Plug in the tub and press the Reset button on the GFCI.
- Set target temperature to 50°F.
- Confirm the blue cooling arrow turns on.
- Listen for compressor operation.
- Allow the system to run for 10 minutes.
- Inspect all plumbing connections for leaks.
⚠️ Keep hands and tools away from the exposed chiller fan.
- Confirm no UI error codes:
- "CF" = Change Filter
- "OR" = Out of Range (sensor is reading outside 37–104°F range)
- If “OR” appears, thermistor replacement may be needed.
- Verify that water temperature is decreasing.
|
|
Power Down The Plunge
- Pause the chiller by pressing the pause button on the UI
- ⚠️ Powering down the Plunge while it's in a cooling cycle can damage the chiller.
- Press the test button on the GFCI outlet to power down the Plunge.
- Unplug the GFCI outlet from the outlet.
🚨 Important: Do not power down the Plunge before pausing the chiller.
|
|
Prepare for Rear Cover Installation
Reattach e-box cover (4 screws).
Secure chiller to frame using the 4 base nuts.
Pre-install the upper thumb nut (near filter housing) loosely—this area is tight with cover on.
|
|
Install Rear Cover
Carefully slide rear cover over chiller.
Ensure power cord is routed through the correct side.
Reinstall all 5 thumb nuts to secure rear panel.
Attach the left and right chiller vents.
|
|
Finalize Installation
|
|