Remove Chiller Vents and Thumb Nuts
- Remove both side chiller vent panels.
- Unscrew all 6 thumb nuts securing the rear panel:
- 3 on the left vent
- 3 on the right vent
|
|
Remove Rear Cover
- Grab the rear cover by the vent openings and slowly pull and wiggle the rear cover free.
|
|
Remove Chiller Mounting Nuts
- Using a 10mm socket/wrench remove the 4 nuts securing the chiller to the base:
- 2 on each side of the chiller base plate.
|
|
Disconnect Electrical Components
- Disconnect all electrical components by unscrewing the threads and pulling.
- The LED wire should be moved to the back of the chiller and set aside.
|
|
Disconnect Plumbing Manifolds
- Disconnect the 4 chiller plumbing manifolds from the tub:
- Main Drain – Located on the right hand side connecting the main drain manifold to the underneath plumbing.
- TH-1 – Connects to the right of the water filter housing
- Flow Meter – Runs from the back of the water filter to the bottom of the heat exchanger
- Heat Exchanger to Jet – Connects from the top of the heat exchanger to the lower plumbing union
|
|
Cut Power Cord Zip Ties
- If the power cord is zip tied to the frame of the tub, cut the zip ties and move the power cord out to the right of the chiller.
|
|
Remove Chiller
⚠️ Use two people if needed. Move slowly.
- Grab the handles on each side of the chiller base.
- Carefully lift the chiller off the bolts secured to the base.
- Slowly walk each side of the chiller to pull the chiller out.
|
|
Remove Water Thermistor (TH-1) & Disconnect TH-1 Manifold
- Using pliers unscrew and remove the water thermistor (TH-1) from the TH-1 manifold.
- Disconnect the TH-1 manifold by unscrewing the ab union attached to the outport of the water pump.
|
|
Install Water Thermistor (TH-1) & Connect TH-1 Manifold
- Hand tighten the water thermistor (TH-1) into the TH-1 manifold.
- Using pliers securely tighten the water thermistor.
- Connect the TH-1 manifold to the outport of the water pump.
|
|
Install New Chiller
⚠️ Use caution and two people if necessary.
- Lift the chiller from the chiller handles and set the base of the chiller on the bolts.
- Walk the base of the chiller into place.
- Line up the chiller base holes with the mounting bolts and lower the unit down onto the frame bolts.
|
|
Reconnect Plumbing to Tub
Reconnect the 4 plumbing manifolds:
- Main Drain → On the right side behind the fan connecting to underneath plumbing.
- TH-1 → right of the filter housing.
- Flow Meter → rear of the filter housing.
- Heat Exchanger to Jet → bottom plumbing union below the LED.
⚠️ Double-check for black o-rings on lower plumbing unions before tightening.
🚨 If the Heat Exchanger to jet manifold does not line up to underneath plumbing you will need to follow Step 11-B below to retrofit the plumbing. Click the step below to go to the retrofit work instructions.
Counter Current to Co-Current Plumbing Retrofit (link to retrofit article)
|
|
Reconnect Electrical Components
- Plug in all electrical connectors to their labeled receptacles.
- Identify each component by the labels on the wires
- Ensure all components are secured screwed and pushed in.
|
|
Test for Leaks & Error Codes
⚠️ Warning: The chiller fan is exposed during testing. Keep hands, tools, and loose items away from the fan to avoid injury or equipment damage.
- Fill the Plunge up with water so the water line is 6" below the edge of the tub.
- 🚨 Open the auto-doser ball valves🚨
- ⚠️ If chiller is turned on while auto-doser ball valves are closed it can damage the chiller.⚠️
- Plug in the Plunge and press the “Reset” button on the GFCI plug to power it on.
- Set temperature to 50 degrees so pump powers to 100%.
- Allow the Plunge to run and observe the chiller plumbing union connections.
- Carefully inspect all union fittings for any signs of leaking while the system is running.
- If a leak is found, pause the system and recheck that the union is properly seated and hand-tightened.
- Confirm no error code on UI
|
|
Power Down Plunge
- Pause the chiller by pressing the pause button on the UI
- ⚠️ Powering down the Plunge while it's in a cooling cycle can damage the chiller.
- Press the test button on the GFCI outlet to power down the Plunge.
- Unplug the GFCI outlet from the outlet.
🚨 Important: Do not power down the Plunge before pausing the chiller. |
|
Prepare for Rear Cover Installation
- Using zip ties, secure the power cord back to the original place it was attached to the frame.
- Secure the 4 chiller mounting nuts to the base of the chiller.
- Each nut will have two washers.
- Pre-thread the two upper thumb nuts loosely before installing the rear panel — space is tight once the panel is in place.
- Confirm all wiring and plumbing connections are secure and tidy.
|
|
Install Rear Cover & Chiller Vents
- Slide the rear cover into place.
- Install all 6 thumb nuts (3 per side).
- Reinstall left and right vent panels.
|
|
Comments
0 comments
Please sign in to leave a comment.