Tools Required
2.5mm hex driver
Zip ties
Utility knife or snips (for cutting zip ties)
Protective gloves
Power Down Plunge
🚨 Important: Do not power down the Plunge before pausing the chiller. Powering down the Plunge while it is in a cooling cycle can damage the chiller. | |
Remove Chiller Vents and Thumb Nuts
| |
Remove Rear Cover
| |
Remove E-Box Cover
| |
Remove PCBA Mounting Screws
| |
Transfer over
| |
| Replace Electrical Box Cover |
Install Rear Cover & Chiller Vents
|
Comments
0 comments
Please sign in to leave a comment.